Parkside Drive Improvements

Study Overview
The City of Hamilton has initiated a Schedule C (Phase 3 and 4) Municipal Class Environmental Assessment (Class EA) for Parkside Drive to examine road improvements to Parkside Drive, from Highway 6 to 500m east of Churchill Ave (see map below). This study is building on the recommendations of the Hamilton Transportation Master Plan (May 2007). The required improvements may include road widening to accommodate a continuous two-way left turn lane, as well as a bicycle lane and pedestrian sidewalk.

The study currently includes the following components:

  • development of reasonable alternative design concepts;
  • evaluation of alternatives based on natural, social, economic and technical criteria;
  • selection of a preferred alternative for Parkside Drive;
  • completion of an Environmental Study Report to document all activities undertaken.


Location Map
 

The Process

This study is being planned as a Schedule C project under the Municipal Class EA (Municipal Engineers Association, October 2000, as amended in 2007). As Phases 1 and 2 of the EA process have already been completed through the City’s Transportation Master Plan (2007), this Study will fulfill the requirements of Phases 3 and 4 of the Municipal Class EA Process.

A key component of the study will be consultation with interested stakeholders (public, landowners and regulatory agencies). A Public Information Centre (PIC) will be held later this year to provide interested parties with an opportunity to review and discuss issues related to the study. Details regarding the forthcoming PIC will be advertised as the study progresses.

Public Consultation
Public Information Centre Notice #1
Date: Wednesday September 19th, 2012
Time: 6:00-8:00pm
Location: St. Thomas the Apostle Church (715 Centre Road, Waterdown, ON)

Comments
The project team is interested in hearing any comments that you may have about this study. Comments and information regarding this study are being collected to assist the study team in meeting the requirements of the Environmental Assessment Act. Information will be collected in accordance with the Freedom of Information and Protection of Privacy Act. With the exception of personal information, all comments will become part of the public record. Please use the Comment Sheet.

Please send all comments or requests to any of the following:

Diana Morreale, MClP, RPP
Senior Project Manager
City Hall
71 Main Street West (6th Floor)
Hamilton, ON L8P 4Y5
Phone: 905-546-2424 ext. 4101
Email: Diana.Morreale@hamilton.ca
Mr. Bob Bower
Vice President
Transportation Division
Delcan Corporation
3115 Harvester Road, Suite 102
Burlington, Ontario
Phone: 905-631-0500 ext. 6601
Email: b.bower@delcan.com

  Contact Information
Monday - Friday: 8:30am - 4:30pm

Diana Morreale, MClP, RPP
Senior Project Manager
City Hall
71 Main Street West (6th Floor)
Hamilton, ON L8P 4Y5
Phone: 905-546-2424 ext. 4101
Email: Diana.Morreale@hamilton.ca

Mr. Bob Bower
Vice President
Transportation Division
Delcan Corporation
3115 Harvester Road, Suite 102
Burlington, Ontario
Phone: 905-631-0500 ext. 6601
Email: b.bower@delcan.com

PIC Materials