City of Hamilton City of Hamilton
Submit SearchSubmit Search
City of Hamilton – Public Works

Strategic & Environmental Planning Projects

The following are links to various projects that have been initiated by the City of Hamilton.

Ancaster Transportation Master Plan
Arvin Avenue Extension
Arbour Road Multi-Use Crossing
Binbrook Road and Regional Road 56 Municipal Class Environmental Assessment
Chedoke Golf Course Channel
The City of Hamilton has initiated a study to consider a wide range of options to address recent significant erosion damage that has occurred within a watercourse that descends from the top of the escarpment and through the Chedoke Golf Course lands.
Chedoke Channels Maintenance Class EA Study
Dartnall Road Extension Class Environmental Assessment
Dartnall Road Improvements (Stone Church Road to Rymal Road)
Davis Creek Subwatershed Study
Downtown Dundas Transportation Master Plan

Downtown Transportation Master Plan - 5 Year Review

Flood Aware Preparedness Program
Frid Street Extension Municipal Class EA
Fruitland Rd. (Barton to Hwy 8) Environmental Assessment 

Greenhill Avenue Area Storm Drainage Study - This Greenhill Avenue Area Storm Drainage Study is being undertaken to assess and analyze the overall drainage system including overland flow and storm sewer components of the Greenhill Avenue Study Area and upstream contributing areas.

Greensville Sub-Watershed Study
GRIDS Integrated Infrastructure Master Plans

GRIDS FAQ

GRIDS Master Plan Public Events

GRIDS Stormwater Master Plan

GRIDS Transportation Master Plan

GRIDS Water/Wastewater Master Plan
Hamilton Bridges Master Plan Class EA (HCA2)
Highway 8 Improvements – Park Avenue to Bond Street Municipal Class EA
Highway 52 and Jerseyville Road Intersection Improvements

Integrated Management System

Intersection Improvements to Stone Church Road and Omni Boulevard
Kirkendall Neighbourhood Traffic Management Study
Longwood Road Municipal Class EA
Lower East End Storm Drainage Study and Stormwater Management Investigation
Mountview Neighbourhood Storm Drainage Study and Stormwater Management Facility Location Review
Multi-modal Transportation Terminal
North End Traffic Management Study
Poulette/Pearl/Ray Street Pedestrian Bridges Master Plan
Rapid Transit
Moving Hamilton Forward
Rymal Road Planning Area Study (ROPA 9)
Rymal Road Improvements (Dartnall Road to the New Trinity Church Corridor)
Sanatorium Road and Stormwater Class Environmental Assessment
SCUBE Transportation
SCUBE Subwatershed
Setting Sail - West Harbour Planning Area Study

Stormwater Quality Management Strategy, Community of Stoney Creek - Master Plan 
Note: Due to large file sizes, the Appendices for this report cannot be posted; however, a CD copy is available for purchase at $5.00 each by contacting sbanuri@hamilton.ca

Strathcona Neighbourhood – Waterfront Trail Pedestrian Connection
Strathcona Transportation
Truck Route Master Plan Study
Valley Inn Road Bridge Municipal Class Environmental Assessment
Watercourses 5 and 6 Municipal Class Environmental Assessment

Watercourse Erosion Assessment Study

Waterdown / Aldershot Transportation Master Plan

Waterdown North and Waterdown South Secondary Plan & Class Environmental Assessment
Waterfront Advisory Group
West Harbour Waterfront Recreation Master Plan
York Boulevard Commuter Cycling Class Environmental Assessment