| Ancaster Transportation Master Plan |
| Arvin Avenue Extension |
| Arbour Road Multi-Use Crossing |
| Binbrook Road and Regional Road 56 Municipal Class Environmental Assessment |
| Centennial Bridge EA |
Chedoke Golf Course Channel The City of Hamilton has initiated a study to consider a wide range of options to address recent significant erosion damage that has occurred within a watercourse that descends from the top of the escarpment and through the Chedoke Golf Course lands. |
| Chedoke Channels Maintenance Class EA Study |
| Dartnall Road Extension Class Environmental Assessment |
| Dartnall Road Improvements (Stone Church Road to Rymal Road) |
| Davis Creek Subwatershed Study |
| Downtown Dundas Transportation Master Plan |
|
Downtown Transportation Master Plan - 5 Year Review |
| Fessenden Neighborhood Stormwater Management Project Municipal Class Environmental Assessment |
| Flood Aware Preparedness Program |
| Frid Street Extension Municipal Class EA |
| Fruitland Rd. (Barton to Hwy 8) Environmental Assessment |
| Garner/Rymal & Garth EA |
|
Greenhill Avenue Area Storm Drainage Study - This Greenhill Avenue Area Storm Drainage Study is being undertaken to assess and analyze the overall drainage system including overland flow and storm sewer components of the Greenhill Avenue Study Area and upstream contributing areas. |
| Greensville Sub-Watershed Study |
| GRIDS Integrated Infrastructure Master Plans |
|
GRIDS FAQ |
| GRIDS Master Plan Public Events |
|
GRIDS Stormwater Master Plan |
|
GRIDS Transportation Master Plan |
| GRIDS Water/Wastewater Master Plan |
| Hamilton Bridges Master Plan Class EA (HCA2) |
| Hannon Creek Subwatershed Studies |
| Heritage Bridge Assessment |
|
Highway 5 & Highway 6 Interchange |
| Highway 8 Improvements – Park Avenue to Bond Street Municipal Class EA |
| Highway 52 and Jerseyville Road Intersection Improvements |
|
Integrated Management System |
| Intersection Improvements to Stone Church Road and Omni Boulevard |
| Jasper Drive and Bland Avenue Flooding Investigation Project |
| Kirkendall Neighbourhood Traffic Management Study |
| Longwood Road Municipal Class EA |
| Lower Davis Creek Flood and Erosion Class EA |
| Lower East End Storm Drainage Study and Stormwater Management Investigation |
| Mohawk College Transit Terminal |
| Mountview Neighbourhood Storm Drainage Study and Stormwater Management Facility Location Review |
| Multi-modal Transportation Terminal |
| North End Traffic Management Study |
|
Parkside Drive Improvements |
| Pedestrian Master Plan |
| Poulette/Pearl/Ray Street Pedestrian Bridges Master Plan |
|
|
| Rymal Road Planning Area Study (ROPA 9) |
| Regional Official Plan Amendment (ROPA 9) Transportation Master Plan Review |
| Rymal Road Improvements (Dartnall Road to the New Trinity Church Corridor) |
| Sanatorium Road and Stormwater Class Environmental Assessment |
| SCUBE Transportation |
| SCUBE Subwatershed |
| Setting Sail - West Harbour Planning Area Study |
|
Stormwater Quality Management Strategy, Community of Stoney Creek - Master Plan Note: Due to large file sizes, the Appendices for this report cannot be posted; however, a CD copy is available for purchase at $5.00 each by contacting sbanuri@hamilton.ca |
| Strathcona Neighbourhood – Waterfront Trail Pedestrian Connection |
| Strathcona Transportation |
| Transportation Summit 2011 |
| Truck Route Master Plan Study |
| Valley Inn Road Bridge Municipal Class Environmental Assessment |
| Watercourses 5 and 6 Municipal Class Environmental Assessment |
|
Watercourse Erosion Assessment Study |
|
Waterdown / Aldershot Transportation Master Plan |
| Waterdown North and Waterdown South Secondary Plan & Class Environmental Assessment |
| Waterfront Advisory Group |
| West Harbour Waterfront Breakwater & Shoreline Protection Infrastructures |
| West Harbour Waterfront Recreation Master Plan |
| York Boulevard Commuter Cycling Class Environmental Assessment |