Rymal Road Planning Area Study (ROPA 9)

 The Study

The City of Hamilton has initiated the Master Plan Class Environmental Assessment (EA) process to assess the transportation, water supply, and sewage needs for the Rymal Road Planning Area. Amendment No. 9 to the Region of Hamilton-Wentworth Official Plan (ROPA 9) redesignated approximately 190 hectares (470 acres) of land in this area, to allow urban development. The Rymal Road Planning Area will require growth related infrastructure and service improvements, including the following potential projects:

  • the widening of Rymal Road;
  • a new road link from Stone Church Road / Red Hill Creek Expressway ramps to Rymal Road (on an alignment to be determined)

  • the construction of a new signalized collector road intersection with Regional Road 56 and the widening of Regional Road 56 between the new collector road and Rymal Road;
  • storage and pumping capacity improvements to the water distribution system; and
  • wastewater improvements to connect the proposed sanitary sewer system to the City’s trunk system.

The Study Area

The subject lands are located on the south side of Rymal Road East (Highway No. 53), east of Trinity Church Road, west of Regional Road 56, and north of the hydro corridor, in the former Township of Glanbrook.

Special Policy Area ‘C’ is also included in the study.  This area is bounded by Mud Street West to the north, Paramount Drive to the south, Winterberry Drive to the east, and the Mud Street / Red Hill Creek interchange to the west.


(Click for larger image)

The Process

This project is being planned under Section A.2.7. Master Plans as defined in the Municipal Engineers Association, Municipal Class Environmental Assessment document (June 2000) and will satisfy the planning and design process for Schedule ‘B’ and ‘C’ projects.

Reports

  • Report PW06073 to Public Works Infrastructure and Environment Committee, May 19, 2006

Rymal Road Planning Area (ROPA 9) Master Plan Class Environmental Assessment
Phase 1 and 2 Master Plan Report

 

  • Index and Table of Contents
  • Chapter 1
  • Chapter 2
  • Chapter 3
  • Chapter 4
  • Chapter 5
  • Chapter 6
  • Chapter 7
  • Chapter 8
  • Chapter 9
  • Chapter 10
  • Appendix A
  • Appendix B.1
  •  

  • Appendix B.2.1
  • Appendix B.2.2
  • Appendix B.3
  • Appendix B.4
  • Appendix B.5 Part 1
  • Appendix B.5 Part 2
  • Appendix B.5 Part 3
  • Appendix C
  • Appendix D
  • Appendix E
  • Appendix F Part 1
  • Appendix F Part 2
  • Appendix G


  • Trinity Church Arterial Corridor,
    Class Environmental Assessment Phase 3 and 4











     

    Trinity Neighbourhood Collector
    Phase 3 and 4 Class Environmental Assessment
    This Study is currently on hold

    Trinity Collector map

    Public Information Centre No. 1


    Special Policy Area "C" Transportation Improvements,
    Class Environmental Assessment Phase 3 and 4










    Rymal Road and RR #56 Transportation Improvements (ROPA9 Planning Area)
    Class Environmental Assessment Phase 3 & 4 Final Report












    Contact

    If you have any questions or would like more information on this project please contact:

    Mohan Philip, M. Eng., P. Eng.
    Project Manager, Transportation/Transit
    Strategic Planning & Rapid Transit
    Environment & Sustainable Infrastructure Division
    Public Works Dept., City of Hamilton
    320 - 77 James Street North
    Hamilton, ON, Canada, L8R 2K3
    Phone: 905 546 2424 ext. 3438
    Fax:   905 546 4435
    Email: tplanning@hamilton.ca


    www.hamilton.ca/ropa9