Home
Login
My Personal Page
Contact Us
Help and FAQs
e-Store
Cart
Home
City Services
City Departments
Culture & Recreation
Public Health & Social Services
Business & Industry
Tourism & Visitor Info
Your Elected Officials
Help
City of Hamilton Home
City Services
City Departments
Community Services
Contact Us
Corporate Services
Emergency Services
Human Resources
Office of the City Manager
Planning & Economic Development
Public Health & Social Services
Public Works
Environment & Sustainable Infrastructure
Parks
Red Hill Valley Project
Central Fleet
Corporate Facilities Management
Office of Energy Initiatives
Road Maintenance and Operations
Traffic Engineering and Operations
Waste Management
Water & Wastewater
Sewer
Contact Us
Hamilton Children's Water Festival
Reports & Plans
Water Reports
Sustainability Report Cards
WINS
Biosolids EMS
Environmental Study Report
Communal Water Studies and Reports
Groundwater Study
W & WW Master Plan
Biosolids Master Plan
Stormwater Rate Feasibility Study
Conservation & Education
Drinking Water
Programs
Rates
Protective Plumbing Program (3P)
Water and Wastewater Treatment Plant
Wastewater Treatment Plant Brochure
Water Quality Program
Biosolids Program
Hamilton Harbour Puppet Shows
Services
Public Works Department
Right-of-Way Management
Events and Initiatives
Transit
Together, we're caring for our environment
Culture and Recreation
Public Health Services & Social Services
Projects & Initiatives
News and Publications
Your Elected Officials
Hot Topics
Business & Industry
Tourism & Visitor Info
Popular Links
Hamilton Public Library
Community events
HECFI concerts and events
Invest in Hamilton
Tourism Hamilton
Hamilton Police Services
Woodward Avenue WWTP
Print
Site Map
Enhanced Conceptual Design Report for
Woodward Avenue Water Treatment Plant
Woodward Avenue WWTP Enhanced Conceptual Design Report
Appendices:
Appendix A
- Existing Certificate of Approval
Appendix B
- Mass Balance
Appendix C
-
Detailed Calculation of Raw Wastewater Pumping Station Rise Rate
Appendix D
- Raw Wastewater Pumping Station Construction Sequencing
Appendix E
- Philips Engineering Red Hill Creek Modifications Report
Appendix F
- CRA Electrical Report
List of Figures
Figure 1
- WWTP & WTP Existing Distribution System Layout
Figure 2
- Woodward Avenue Treatment Facility Site Plan
List of Tables
Table 1
- Electrical Distribution System Conceptual Cost Estimate
List of Appendices
Appendix A
- Summary of WWTP and WTP Load Data
Table A1
- Woodward Aggregated Future Electrical Load Calculations
Table A2
- Woodward WWTP Future Electrical Load Calculations
Table A3
- Woodward WTP Future Electrical Load Calculations
Appendix B
- Horizon Utilities Corporation System Information
Appendix C
- Concept Design Drawings
Appendix D
- Electrical Distribution System Conceptual Implementation Schedule
Appendix E - Technical Memorandum No 1 - Fundamental Distribution Concepts
Appendix F - Technical Memorandum No 2 - Distribution Design Options
Appendix G - Excerpt From "Woodward Avenue Facilities - Energy Plant Development Plan"
Appendix G
- Detailed Cost Tables
Drawings:
C-001
- EXISTING SITE PLAN
C-002
- PROPOSED SITE PLAN
C-003
- OVERALL PROCESS FLOW DIAGRAM FOR UPGRADE AND EXPANSION
C-004
- HYDRAULIC PROFILE EXISTING CONVENTIONAL ACTIVATED SLUDGE TRAIN
C-005
- HYDRAULIC PROFILE MICRO SCREEN AND MEMBRANE FILTER TRAIN
C-006
- HYDRAULIC PROFILE MICRO SCREEN AND MEMBRANE BIOREACTOR TRAIN
C-007
- RAW WASTEWATER PUMPING STATION YARD PIPING LAYOUT
C-008
- RAW WASTEWATER PUMPING STATION WET WELL PLAN
C-009
- RAW WASTEWATER PUMPING STATION MAIN FLOOR PLAN
C-010
- RAW WASTEWATER PUMPING STATION SECTION
C-011
- RAW WASTEWATER PUMPING STATION STAGING PLAN - PHASE 1
C-012
- RAW WASTEWATER PUMPING STATION STAGING PLAN - PHASE 2
C-013
- RAW WASTEWATER PUMPING STATION STAGING PLAN - PHASE 3
C-014
- RAW WASTEWATER PUMPING STATION STAGING PLAN - PHASE 4
C-015
- PROCESS FLOW DIAGRAM CAS/MF (OPTION 1)
C-016
- PROCESS FLOW DIAGRAM TMBR (OPTION 2)
C-017
- SOUTH PLANT AERATION TANKS MODIFICATION AND RAS FLOWMETER PLAN
C-018
- SOUTH PLANT SECONDARY CLARIFIER MODIFICATION PLAN
C-019
- NORTH PLANT AERATION TANKS MODIFICATION PLAN
C-020
- NORTH PLANT AERATION TANKS MODIFICATION SECTIONS
C-021
- NORTH PLANT SECONDARY CLARIFIER MODIFICATION PLAN
C-022
- PROPOSED SECONDARY TREATMENT AND MEMBRANE PLANT SITE PLAN
C-023
- MICRO SCREEN FACILITY PLAN
C-024
- AERATION TANKS, MEMBRANE FACILITIES & CHLORINE CONTACT CHAMBER PLAN
C-025
- MEMBRANE BIOREACTOR PLAN
C-026
- MEMBRANE BIOREACTOR SECTION
C-027
- MEMBRANE FACILITY BLOWER BUILDING PLAN & SECTION
C-028
- WAS THICKENING BUILDING PLAN FOR GRAVITY BELT THICKENER
C-029
- DEWATERING BUILDING CENTRIFUGE PLAN AT EL. 87.00m
C-030
- DEWATERING BUILDING BASEMENT PLAN AT EL. 79.325m
C-031
- BIRCH AVENUE CSO PUMPING STATION SITE PLAN
C-032
- PROPOSED CSO PUMPING STATION SITE PLAN: MAIN-KING CSO TANK SITE
C-033
- PROPOSED BIRCH AVE, CSO PUMPING STATION MAIN FLOOR PLAN
C-034
- PROPOSED BIRCH AVE, CSO PUMPING STATION PIPING PLAN AND SECTION
C-035
- PRELIMINARY CONSTRUCTION CONTRACT LAYDOWN AREAS