Integrated Water and Wastewater Master Plan for the Lake Based Systems
The water and wastewater master plan is being developed in three stages as illustrated.

Stage 1Baseline Study / Identify Opportunities and Constraints / Optimization Review
• The completion of a baseline study, is currently underway • Water and wastewater system models are being developed to simulate the present network conditions and capacity • Data is being collected to calibrate the models
Stage 2 Development of Policy
• Complete - Presented to the Public Works Infrastructure and Environment Committee, May 2, 2005 • Set policy framework to guide the Master Plan process
Stage 3 Integrated Master Plan
• Adhere to the Municipal Class Environmental Assessment process with the public consultation for the water/wastewater master plan being integrated with the transportation and stormwater master plans • Provide opportunity for input from all stakeholders • Include a holistic look at water and wastewater servicing • Study area includes lake based systems, communities of Carlisle and Greensville • Will assess the impact of the proposed growth scenarios developed through GRIDS on water, wastewater, transportation and stormwater servicing concurrently. • The master plans will be consistent with and reflect the servicing needs for the preferred growth pattern which will form the basis of the City’s new official plan.
| If you have any questions or wish to be added to the study mailing list, please contact: |
|
Chris Gainham Senior Project Manager, Water and Wastewater Planning Public Works Department 55 John Street North - 6th Floor Hamilton, ON, L8R 3M8
Tel: 905-546-2424 ext. 3421 Fax: 905-546-4491 e-mail: christopher.gainham@hamilton.ca
|

|
|
|
|