Final Technical Reports

Life Cycle Cost/Benefit Analysis -Executive Summary
Life Cycle Cost Benefit Analysis
Completing the Red Hill Creek Expressway - Economic Development Implications 

Assessment of Updated Auto & Truck Forecasts 

King's Forest Golf Course Impact Assessment Study
Niagara Escarpment Expressway Crossing Alternative Designs Report
Vehicle Air Emissions Inventory
Thermal Dynamics Impact
Fisheries Existing Conditions and Predicted Impact
Economic Impact to Business at QEW Interchange
Traffic Forecast for Noise & Air Quality

Hydrogeologic Inventory and Impact Assessment

Impact Assessment Summary Report - Executive Summary

Highway Noise Impact Assessment at the QEW Interchange

Impact Assessment and Design Process Summary - Final Report

Report Cover

Pages 1-20

Pages 21-40 Pages 41-60
Pages 61-80 Pages 81-120
Pages 121-131 Pages 132-143

Southern Flying Squirrel Study

Southern Flying Squirrel Study

Figure 2.4
Figure 2.5 Figure 2.7
Figure 2.8 Figure 4.4
Figure 4.5 Figure 4.7

Escarpment Crossing Visual Assessment

Part-01 Part-02 Part-03 Part-04
Part-05 Part-06 Part-07 Part-08
Part-09 Part-10 Part-11 Part-12
Part-13 Part-14 Part-15 Part-16
Part-17 Part-18 Part-19 Part-20
Part -21 Part -22 Part -23 Part -24
Part -25 Part -26 Part -27 Part -28
Part -29 Part -30 Part -31  

Cultural Heritage Resource Assessment

Part-01 Part-02 Part-03 Part-04
Part-05 Part-06 Part-07 Part-08
Part-09 Part-10 Part-11 Part-12
Part-13 Part-14 Part-15 Part-16
Part-17 Part-18 Part-19 Part-20
Part -21 Part -22 Part -23 Part -24
Part -25 Part -26 Part -27 Part -28
Part -29 Part -30 Part -31 Part -32
Part -33 Part -34 Part -35 Part -36
Part -37 Part -38 Part -39 Part -40
Part -41  

A Stream Network, Inventory, Fluvial Geomorphologic Assessment, Impact Assessment, and Preliminary Natural Channel Design of Red Hill Creek

Part-1 Part-2 Part-3 Plot-1
Plot-2 Plot-3 Prelim-1 Prelim-2
Prelim-3 Prelim-4 Prelim-5 Prelim-6
Appendix 1 Appendix 2 Appendix 3 Appendix 4
Appendix 5 Appendix 6 Appendix 7 Appendix 8
Appendix 9  

Air Quality Assessment

Post Construction Air Quality Report - February 2010
Part-1 Part-2 Part-3 Part-4
Part-5  

Traffic Noise Impact

Part-1 Part-2 Part-3 Part-4
Part-5 Part-6  

Contaminated Sites Impact Assessment

Appendix A-1 Appendix A-2 Appendix B Appendix C-1
Appendix C-2 Appendix C-3 Appendix D-1 Appendix D-2
Appendix E Appendix F-1 Appendix F-2 Appendix F-3
Appendix F-4 Appendix F-5 Appendix F-6 Appendix F-7
Appendix F-8  
Figure 1-1 Figure 2-1 Figure 2-2 Figure 2-3
Figure 2-4 Figure 2-5 Figure 2-6 Figure 2-7
Figure 2-8 Figure 2-9 Figure 2-10 Figure 2-11
Figure 2-12 Figure 3-1 Figure 3-2 Figure 3-3
Figure 3-4 Figure 3-5 Figure 4-1 Figure 4-2
Figure 4-3 Figure 4-4 Figure 4-5  
Table 3.1 to 3.13 Table 4.1 to 4.10  
References Report  

Post-Construction Ambient Air Quality Monitoring

Report Tables & Figures
Appendix A-E Appendix F-H

Pre-Construction Ambient Air Quality Monitoring

Report Tables Figures Appendix A-C
Appendix D Appendix E-F Appendix G Appendix H-I

Snowdrifting Assessment

Report Figures Appendix A-B Site A
Site B Site E Site I  Site K

Final Terrestrial Resources Technical Report

Report Figure 1 Figure 2A Figure 2B
Figure 2C Figure 2D Figure 2E Figure 2F
Figure 3A Figure 3B Figure 3C Figure 3D
Figure 4A Figure 4B Figure 4C Figure 4D
Figure 4E Figure 4F Figure 5A Figure 5B
Figure 5C Figure 5D  

Land Use Assessment Report

Report Figure 1 Figure 2
Figure 3  

Surface Water and Stormwater Quality Technical Report

Report Table of Contents Executive Summary Appendix Cover
Table 5.1 Table 6.5 Table 6.10 Table 6.17
Table 7.1 References Figure 1 Figure 2
Figure 3 Figure 4 Figure 5 Figure 6
Figure 7 Figure 8 Figure 9 Figure 10
Figure 11 Figure 12a Figure 12b Figure A
Appendix A Appendix B (Input) Appendix B (Output) Appendix B Figure
Appendix C (DS Input) Appendix C (DS Output) Appendix C (US Input) Appendix C (US Output)
Appendix C DS Figure Appendix C US Figure Appendix D Appendix E1
Appendix E2 Appendix E3 Appendix E4 Appendix E Ammonia
Appendix E B0D5 Appendix E Copper Appendix E Fec. Col. Appendix Figure 1
Appendix Figure 2 Appendix E PAH Appendix E TKN Appendix E Total P
Appendix E TSS Appendix E Zinc Appendix F1 Appendix F2
Appendix F3  

Draft Landscape Management Plan

Introduction Section 1 Section 2 Section 3-1
Section 3-2 Section 4 Figure 1.1 Figure 3.1a
Figure 3.1b Figure 3.2a Figure 3.2b Figures 3.3 - 3.5
Appendix A Appendix B Appendix C1 Appendix C2
Figure C1  
Predicted Increases in Respirable Particulate Matter (PM), NO2, CO, and VOC Near The Red Hill Valley Expressway: Possible Human Side Effects From Exposure
"A copy of the Report has been circulated to the Public Health and Community Services Department. Although they have not yet commented on the report, they will be doing so in the near future."

Summary Overview

Resource Document

Chapters 1 & 2 Chapter 3
Chapter 4 Chapter 5    
Public Consultation Report
Report Appendix 5 Appendix 6 Appendix 6a
Appendix 6b Appendix 7 Appendix 7a Appendix 7b
Appendix 7c Appendix 7d Appendix 8 Appendix 8a
Appendix 8b Appendix 9 Appendix 9a Appendix 9b
Appendix 9c Appendix 9d Appendix 9e  
Rennie Street Excavation
Excavation and Materials Management Plan Decontamination Plan Dewatering Plan Dust and Odour Control Plan
Emergency Response and Contingency Plan Public Notification and Public Complaint Management Plan Special Waste Management Plan Supplemental Health and Safety Plan
Surface Water Management and Control Plan Waste Classification and Segregation Plan Waste Stabilization Plan  
 
Toll Traffic and Revenue Estimates
Executive Summary Final Report
Appendix A Appendix B Appendix C