Master Plans & Class EAs

Ainslie Wood Neighbourhood Traffic Management Review

Notice of Study Completion & Public Review Period

The City of Hamilton has completed two Neighbourhood Traffic Management Review studies to identify and recommend potential transportation-related improvements for two neighbourhoods, Ainslie Wood and Westdale. When implelemented, these improvements will benefit all road-users and better reflect the Complete-Livable-Better Streets concept of design outlined in the 2018 Hamilton Transportation Master Plan.

Project File Report

The Project File Reports has been prepared, which detail the planning and design process, how public and agency input was addressed, the preferred alternative solutions and next steps towards project implementation. The report is available for a 30-day review period, from February 14, 2020 to March 14, 2020.

Prefer to review in person? Hard copies of the report will be available for review at these locations:

  • Hamilton Public Library - Westdale Branch, 955 King Street West, Hamilton
  • City Hall, 71 Main Street West, 1st Floor (City Clerk’s Office)

Provide your comments

If after reviewing the reports, you have any questions or concerns, please contact:

Bryan Purins
Project Manager, Roadway Safety
City of Hamilton
Phone: 905-546-2424 ext. 1713
Email: [email protected]

Ravi Bhim
Head Traffic Engineering
Wood Environment & Infrastructure Solutions
Phone: 905-335-2353 ext. 3136
Email: [email protected]

Information collected will be used in accordance with the Freedom of Information and Protection of Privacy Act. With the exception of personal information, all comments will become part of the public record.

 

The City of Hamilton has initiated a Neighbourhood Traffic Management Review to identify issues and assess alternatives that address existing opportunities and challenges in the Ainslie Wood neighbourhood.

This project will reflect aspects of a Municipal Class Environmental Assessment (EA) Master Plan process, addressing Phases 1 and 2. Following this review, if projects under the EA are identified then a Project File Report will be provided by the consultant. If no EA projects result from this study, the final report will be a Traffic Management Report. 

Status: Active. The Management Review was initiated in February 2018 and is anticipated to be completed in Q1 2019.

Classification: Intend to address Phase 1 and 2 of the EA

Location map for Ainslie Wood Traffic Managment Review

The public and stakeholders are welcome to provide the City and its consultant with information that would be useful to the Neighbourhood Review and on materials prepared for this review.

Public Information Centre No. 2
Held May 21, 2019
Presented the results of the evaluation process and recommended solutions.
Display panels (PDF, 6 MB)

Public Information Centre No. 1
Held June 21, 2018
Display panels (PDF, 15 MB)  | Potential alternative panels (PDF, 4 MB)

Contact us

For questions, comments or to be added to the mailing list contact:
Bryan Purins
Project Manager, Roadway Safety
Phone: 905-546-2424 ext. 1713
Email: [email protected]