Master Plans & Class EAs

Highway 8 (Fruitland Road to Fifty Road)

The City of Hamilton initiated the Municipal Class Environmental Assessment or Class EA process for Highway 8 Improvements (Fruitland Road to Fifty Road).

Based on previously completed studies, it was identified that improvements would be required within the corridor to address roadway capacity, transit, active transportation and goods movement as a result of the future growth within the Fruitland-Winona Secondary Plan area.

Location: Highway 8 (Fruitland Road to Fifty Road) is located within the Fruitland-Winona Secondary Plan.

In May 2014, the City adopted the Fruitland-Winona Secondary Plan, which established land uses, transportation network, infrastructure requirements, and development standards to guide development of the area for a 20-year period. In June 2018, the Local Planning Appeal Tribunal approved the Fruitland-Winona Secondary Plan (except for lands subject to site specific appeals).

Study status: Active

Classification: Schedule C (Phases 3 and 4)

Location map of Highway 8 improvements from Fruitland Road to Fifty Road)

Public Information Centre No. 1
Held October 17, 2019
Introducing the project and receiving public input about the project.
Display panels (PDF, 11 MB) | Comment sheet (PDF, 204 KB)

Contact us

If you have any questions or comments or wish to be added to the study mailing lsit, contact:
Melanie Anderton
Project Manager
Phone: 905-546-2424 ext. 6412
Email: [email protected]