Learn more about the provincial framework and how our community’s collective effort can prevent and contain the spread of the virus...
October 26 2018
HAMILTON, ON – Motorists in Hamilton should expect rolling lane and ramp closures on the Red Hill Valley Parkway between Monday, October 29 and Friday, November 2, 2018.
The intermittent lane closures will take place between 9 a.m. and 3 p.m. on both sides of the Red Hill Valley Parkway between Dartnall Road and the QEW. Motorists should also expect temporary closures of the on and off ramps along the parkway during these time periods.
These temporary lane and ramp closures are part of a study to prepare for the resurfacing of Red Hill Valley Parkway in summer 2019. The study includes an audit of the roadside safety infrastructure such as guiderails, shoulders, and speed enforcement areas.
The City thanks motorists for their patience and cooperation as we complete this audit and prepare for resurfacing of the Red Hill Valley Parkway.