LRT Enabling Works
If you have any questions about the future LRT, please contact the Hamilton LRT Community Engagement team:
Email [email protected]
Learn about the process and requirements for development and temporary lane/sidewalk occupancies adjacent to or on the LRT corridor.
Building Near Metrolinx – Guidelines and Permits
Enabling Works Phase Underway
Upcoming Hamilton LRT Works - Utility Inspection
Duration: Aug 31, 2026 to Dec 31, 2026
Working Hours: Monday to Sunday, 7 am to 7 pm
Where: Along the future Hamilton LRT Route
As part of the detailed design phase of the Hamilton LRT, additional field investigations are required. Over the coming months, the team will investigate locations along the LRT alignment to validate existing information and collect additional data needed to support project design and construction planning.
What to Expect
- Increased presence of construction vehicles and equipment can be expected in the work area.
- Work areas will be clearly marked or fenced off to ensure public safety.
- EMERGENCY CONTACT: In case of emergencies, please call David Pitt – 416-668-4363 or Mario Caramo – 289-465-4398
Traffic Changes
- Minor delays may be experienced near the work zone.
- All businesses in the area will remain open during the work. Please follow signage for access.
Pedestrian Access
- Pedestrian detours may be required, with signs in place to direct pedestrians as needed.
Transit
- Some HSR bus stops will be closed for periods of time during the work. Signs will be posted to keep residents informed.
For further details and information visit the Hamilton LRT - Utility Inspection page on metrolinx.com