Hatt Street Functional Design Study

Carson McKean, P.Eng.
Project Manager, Design
Engineering Services Division
Email [email protected]
Call 905-546-2424 Ext. 5644
Hatt Street (From Bond Street to East End/Main Street) & Bond St (From King Street to Hatt Street) requires a full reconstruction due to the condition of the pavement and watermain and to incorporate Complete Street Design Guidelines (2022), namely, to improve multi-modal user safety.
To guide the future Detailed Design of Hatt Street and Bond Street, a Functional Design of the surface features of the road corridor will be undertaken.
The Functional Design will consider upgrading the Streetscape Features such as:
Public Information Centre
The City and their Consultant will commence the Functional Design in Fall of 2025, with engagement and PIC expected in Winter 2026, with an assignment completion in Summer 2026. Detail Design will follow in Fall 2026.