Hatt Street Functional Design Study
Carson McKean, P.Eng.
Project Manager, Design
Engineering Services Division
Email [email protected]
Call 905-546-2424 Ext. 5644
Hatt Street (From Bond Street to East End/Main Street) & Bond St (From King Street to Hatt Street) requires a full reconstruction due to the condition of the pavement and watermain and to incorporate Complete Street Design Guidelines (2022), namely, to improve multi-modal user safety.
To guide the future Detailed Design of Hatt Street and Bond Street, a Functional Design of the surface features of the road corridor will be undertaken.
The Functional Design will consider upgrading the Streetscape Features such as:
Public Information Centre
PIC will include a presentation paired with accompanying project boards and provide information on the project and inviting participant feedback and comment on design options.
Date Tuesday, July 21, 2026
Time 6to 8 pm
Location Dundas Museum, 139 Park St W, Dundas, ON L9H 1X8