Waterfront Redevelopment
Pier 8 Gateway Park
Adjacent to the boardwalk and transient docks installed on Pier 8 in June 2016, the gateway park will offer waterfront residents and visitors:
- a large open area for outdoor market booths
- seating areas
- potential location for food trucks or concessions
Timeline
- Late 2018: Construction began
- Early 2017: Detailed design process for the remaining park elements began
- Early 2016: Transient dock & boardwalk elements were constructed
- 2014: Conceptual design process for the park began to align with the design for the reconstructed shoreline