Cycling Infrastructure
For more information about the bike network contact:
Transportation Planning
Call 905-546-2424 Ext. 7537
Email [email protected]
We want resident feedback on active transportation infrastructure projects.
Accelerated Active Transportation Implementation Plan
A blueprint for delivering the Hamilton Cycling Master Plan faster. Find out how the City plans to double the amount of infrastructure delivered over the next 5 years.
2026 Planned Implementation Projects
| Project Name | Infrastructure Type | Project Stage | Additional Info |
|---|---|---|---|
Whitedeer Rd - Highbury Dr to Rymal Rd, Highbury Dr - Whitedeer Rd to Highland Rd | Buffered Bike Lane | 2026 Implementation | FP - Felker/Highland (Phase 1) Bicycle Facilities(PDF, 1.57 MB) |
Limeridge Rd - Upper Wentworth St to Mountain Brow Blvd | Barrier Bike Lane | 2026 Implementation | |
Pottruff - King St to Barton St, Heather - Pottruff Rd to Woodman Dr, Woodman - Heather Rd to Eugene St | Bicycle Boulevard | 2026 Implementation | |
MacNab St - York Blvd to Guise St | Bicycle Boulevard | 2026 Implementation | |
Cochrane Rd - Central Ave to Greenhill Ave | Bicycle Boulevard | 2026 Implementation | |
Victoria Ave - Ferrie St to Birge St | Bi-directional Bike Lanes | 2026 Implementation | |
Victoria Avenue South - Hunter St to Stinson St, | Two-way Cycle Track | 2026 Implementation |
Cycling Infrastructure Projects
| Project Name | Infrastructure Type | Project Stage | Additional Info |
|---|---|---|---|
| Hwy 8 (Stoney Creek) - King St to Dewitt Rd | Raised Cycle Track | Planning | Sustainable Mobility |
| Strathearne Ave - Britannia Ave to Main St | Multi-use Path | Planning | Engineering Services |
| Nebo Rd - Twenty Rd to Rymal Rd | Multi-use Path | Planning | Engineering Services |
| Highland Rd - First Rd to Upper Centennial Pkwy | Buffered Bike Lane | Planning | Engineering Services |
| Bay St - Cannon St to Strachan St | Barrier Bike Lane | Planning | Sustainable Mobility |
| First Rd W - Green Mountain Rd to Toffee Tl | Buffered Bike Lane | Planning | Sustainable Mobility |
| Golf Links Rd- 403 Bridge to Stone Church Rd | Raised Cycle Track | Planning | Engineering Services |
| Paramount Dr - Winterberry Dr to Mud St | Buffered Bike Lane | Planning | Engineering Services |
| Mohawk Rd - McNiven to Hwy 403 | Raised Cycle Track | Planning | Engineering Services |
| Main St - Victoria Ave to Sherman Ave | Barrier Bike Lane | Planning | Engineering Services |
| Victoria Phase 3 - Stinson St to Rail Trail | Multi-use Path | Planning | Sustainable Mobility |
| Scenic Dr - Goulding Ave to Upper Paradise Rd | Buffered Bike Lane | Planning | Engineering Services |
| King St @ RHVP - Lawrence (Mt Albion-King) King (RHVP-Pottruff) | Raised Cycle Track | Planning | Engineering Services |
| Kentley-Nashdale - Barton (RHVP-Nash) Nash (Barton-Bancroft) Bancroft (Nash-Kenora) Kenora (Transfer Station-Kentley Transfer Station (Kenora–Goderich) | Multi-use Path | Planning | Sustainable Mobility |
| Longwood Rd Macklin St - Franklin Ave to Key Drage Pk Longwood Rd to King St | Multi-use Path | Planning | Sustainable Mobility |
| Picardy Dr Lormont Blvd - Highland Rd to Lormont Blvd First Rd to Centennial Pkwy | Buffered Bike Lane | Planning | Growth Management |
| Simcoe St - John St to Wellington St | Shared Use | Planning | Engineering Services |
| Locke St - York Blvd to King St | Shared Use | Planning | Engineering Services |
| First Rd W - Mud St to Highland Rd | Buffered Bike Lane | Planning | Sustainable Mobility |
| Dundas St - Hwy 6 to Hamilton St | Multi-use Path | Planning | Sustainable Mobility |
| Parkside Dr - Hwy 6 to Hollybush Dr | Raised Cycle Track | Planning | Engineering Services |
| Birch Ave (Phase 2) - Burlington St to Princess St | Multi-use Path | Planning | Engineering Services |
| Rymal Rd - Glancaster Rd to Upper Paradise Rd | Multi-use Path | Planning | Engineering Services |
| Rymal Rd - Upper James St to Upper Wellington St | Multi-use Path | Planning | Engineering Services |
| Rymal Rd - Upper Sherman Ave to Upper Gage Ave | Multi-use Path | Planning | Engineering Services |
| Upper Wellington St - Limeridge Rd to Stone Church Rd | Raised Cycle Track | Planning | Engineering Services |
| Glancaster Rd - Garner/Rymal to Dickenson | Barrier Bike Lane | Planning | Engineering Services |
| Glover Rd - Barton to Hwy 8 | Barrier Bike Lane | Planning | Engineering Services |
| Airport Rd - Upper James St to Glancaster Rd | Buffered Bike Lane | Planning | Engineering Services |
| Book Rd - Southcote Rd to Smith Rd | Buffered Bike Lane | Planning | Engineering Services |
| West 5th St - Rymal Rd to Stone Church Rd | Barrier Bike Lane | Planning | Engineering Services |
| Safari Rd - Kirkwall to Valens | Paved Shoulder | Planning | Engineering Services |
| Fennell Ave - West 5th St to Garth St | Multi-use Path | Planning | Engineering Services |
| West 5th St (South) - Fennell Ave to Governors Rd | Multi-use Path | Planning | Sustainable Mobility |
| Ferrie-Wellington - Wellington St to Victoria Ave, Ferrie St to Simcoe St | Multi-use Path/Buffered Bike Lane | Planning | Sustainable Mobility |
| Centennial Parkway - Van Wagners Beach Rd to Goderich Rd | Raised Cycle Track | Planning | Sustainable Mobility |
| Scenic Dr - Chateau Crt to Goulding Ave | Buffered Bike Lane | Design | Capital Project |
| Dundas St - Reynold St to Avonsyde Blvd | Multi-use Path | Design | Capital Project |
| Clappison Ave - Parkside Dr to Dundas St | Buffered Bike Lanes | Design | Active Transportation Project |
| Project Name | Infrastructure Type | Project Stage | Additional Info |
|---|---|---|---|
Sterling St - Forsythe St to King St | Barrier Bike Lane | Complete | Capital Project |
York Blvd – Dundurn St to Caroline St, Cannon St - York Blvd to James S | Raised Cycle Track | Complete | Capital Project |
York Boulevard (Burlington Connection) - Plains Rd to High Level Bridge | Mini-Jersey Barrier, Bicycle Lane | Complete | Capital Project |
West 5th (Keddy Trail Connector) - Mountain Brow Blvd to Fennell Ave | Multi-use Path | Complete | |
Stone Church Rd - Arbour Rd/Anchor Rd to Upper Red Hill Pkwy | Multi-use Path | Complete | FP - Stone Church Rd – Arbour Rd/Anchor Rd to Upper Red Hill Pkwy(PDF, 627.35 KB) |
Montclair - Gage Park to Edgemont St, Central - Edgemont St to Redhill Valley Trail, Graham - Roxbourough Ave to Lawrence Rd, Frederick – Roxbourough Ave to Barton St | Bicycle Boulevard | Complete | FP - Montclair Ave/Central Ave/Graham Ave/Frederick Ave (PDF, 2.65 MB) |
East 24th - Concession St to Upper Wentworth St | Bicycle Boulevard | Complete | |
Main St - Strathearne Ave to Parkdale Ave | Raised Cycle Track | Complete | Capital Project |
Hollybush Dr - Parkside Dr to Dundas St | Buffered Bike Lanes | Complete | Roadway Safety |
Hwy 8 -Middletown Rd to Rosebough St | Paved Shoulder | Complete | Capital Project |
| Project Name | Infrastructure Type | Project Stage | Additional Info |
|---|---|---|---|
| Concession St/Mountain Brow Blvd - Upper Gage St to Oakcrest Dr | Multi-use Path | Implemented | Capital Project |
| Main St (Ainsle Woods) - Filman Rd to Ofield Rd | Barrier Enhancements | Implemented | Active Transportation |
| Bendamere Ave - West 35th to Columbia Dr Southbend Rd - Laurier Ave to Holt Ave | Bicycle Boulevard | Implemented | Active Transportation |
| Fessenden/Gurnett Neighbourhoods - Wendover/ Greencedar/ Amalfi/ Upper Horning/ Omni | Bicycle Boulevard | Implemented | Active Transportation |
| Upper Paradise Rd - Stone Church Rd to Rymal Rd | Buffered Bicycle Lane | Implemented | Active Transportation |
| Barton St - Woodward Ave to Red Hill Valley Pkwy | Multi-use Path | Implemented | Capital Project |
| Cootes Dr - Baldwin St to Dundas St, Baldwin St - Court St to York St | Multi-use Path, Bicycle Boulevard | Implemented | Active Transportation |
| Project | Infrastructure Type | Project Stage | Additional Info |
|---|---|---|---|
| Emerson St - Main St to Rail Trail | Two-way Cycle Track | Complete | FP - Emerson St - Whitney Ave(PDF, 897.06 KB) |
| John St - Guise St to Strachan St | Two-way Cycle Track | Complete | FP - John St (Guise-Strachan)(PDF, 542.58 KB) |
| Charlton Ave - MacNab St to James St | Bicycle Lanes / Buffer improvements | Complete | FP - Charlton Ave - MacNab St(PDF, 646.78 KB) |
| MacNab St - Charlton Ave to Herkimer St | Bicycle Lanes / Buffer improvements | Complete | FP - Charlton Ave - MacNab St(PDF, 646.78 KB) |
| Wellington St / Copeland Ave | Intersection Improvements | Complete | N/A |
| Inverness Ave - Upper James St to East 8th St | Buffered Bicycle Lanes | Complete | FP -Inverness Ave(PDF, 1.02 MB) |
| East 8th St - Inverness Ave to Queensdale Ave | Bicycle Boulevard | Complete | FP -Inverness Ave(PDF, 1.02 MB) |
| Queensdale Ave - East 8th St to Upper Wellington St | Bicycle Boulevard | Complete | FP -Inverness Ave(PDF, 1.02 MB) |
| Highland Rd - Winterberry Dr to First Rd | Bicycle Lanes / Buffer improvements | Complete | N/A |
| Highway 56 (Summit Park Phase 10) - Dalgleish Trail to Swayze Rd | Multi-use Path | Complete | N/A |
| DeWitt Rd - Highway 8 to Barton St | Buffered Bicycle Lanes | Complete | FP - Dewitt Rd (Barton St to South of Highway 8)(PDF, 682.42 KB) |
| Stonehenge Dr - Southcote Rd to Stone Church Rd | Buffered Bicycle Lanes | Complete | FP - Stonehenge Dr (Southcote - Stone Church)(PDF, 688.58 KB) |
- Cannon St - James St to Sherman Ave - Buffer Enhancements
- Delaware Ave/Maplewood Ave - Wentworth St to Gage Ave - Buffer Enhancements
- Herkimer St/Charlton Ave - Queen St to MacNab St, Hess St to James St - Additional Planters
- John St - Guise St to Stratchan St - Buffer Enhancements
- King St - Stoney Brook Dr to Hwy 8 - Bicycle Lanes
- Locke St - Main St to Hunter St - Buffer Enhancements
- Shamrock Park - Corktown Park to Ferguson Ave - Bicycle Path
- Upper Paradise Rd - 260m south of Mohawk Rd W to Sanatorium Rd - Buffer Enhancements
- Victoria Ave - Cannon St to Hunter St - Cycle Track
- Wilson St - Rousseaux St to Filman Rd - Barrier Enhancements
- York Rd - York Rd to Watsons Lane - Multi-use Path
- Cannon St - between Hess St to James St – Buffer enhancements
- Creighton Rd - between Governors St and Market St – Bicycle lanes
- Echovalley Dr - Mud St to Stockbridge Garden – Design Modification
- Hatt St - John St to Baldwin St - Separated Bicycle Lanes
- Hunter St - MacNab St Catharine St to Park St - Cycle Track
- King St - Dundurn St to Paradise Rd – Barrier Enhancements
- Paramount Dr - Old Mud St & Atlas St - Buffer Enhancements
- Stone Church Rd: Golf Links to Omni Blvd – Buffer Enhancements
- York Blvd - Dundurn Castle Entrance to Hess St – Barrier Enhancements
- Victoria Ave - Cannon St to Copeland Ave – Cycle Track
- Stone Church Rd @ Garth St - Connection Enhancement
- Strachan St East - James to Ferguson - Multi-use Path
- Leavitt Blvd - Dundas St to Brow – Buffered Bicycle Lanes
- Dalgleish Trail - Bellagio Ave to Regional Rd 56 - Multi-use Path
- Bay Street - between Hunter Street & Charlton Ave, additional buffer bollards
- Beach Boulevard - Eastport Drive to Van Wagner’s Beach Road, an eastbound bicycle lane painted
- Britannia Avenue - between Cannon Street/ Barons Avenue & Walter Avenue, bicycle lanes painted
- Cannon Street - between Sherman Avenue & the stadium, bicycle lanes painted
- Heritage Green Sports Park - at Echovalley Drive, a multi-use trail
- Herkimer/Charlton - planters added in painted buffer to increase safety
- Hwy 8 crossing the escarpment - between Greensville (Park Avenue) & Dundas (CN rail bridge), some paved shoulders and a wider climbing lane
- Hunter Street - at Queen Street, bicycle path from Canada Street and signal modifications
- Hunter Street - Queen Street to Park Street & Catharine Street to Liberty Street, addition of a barrier
- Hunter Street - Liberty Street to the Keddy Access Trail, bicycle lanes painted with a buffer
- Keddy Access Trail (along the Claremont Access) – between Hunter Street & West 5th Street, a multi-use trail constructed
- Locke Street - between King Street & Hunter Street, bicycle lanes painted with some buffer
- Melvin Avenue - between Walter Avenue & Woodward Avenue, bicycle lanes painted
- Napier Street - at Queen Street, a new signal
- Stone Church Road - between Dartnall Road & Anchor Road, a multi-use path constructed
- Victoria Avenue - between Burlington Street & Ferrie Street, bicycle lanes painted with two-way conversion
- Avonsyde Boulevard - between Parkside Drive & Dundas Street, a multi-use trail constructed
- Cannon Street - between James Steet & Sherman Avenue, rehabilitation of existing cycle track
- Echovalley Drive - between Stockbridge Gardens & Mud Street, bicycle lanes constructed
- Governor’s Road - between Davidson Boulevard & Creighton Road, bicycle lanes west of Moss Boulevard & a bicycle path easterly
- Locke Street - between George Street & Hunter Street, bicycle lanes painted
- Parkside Drive - between Hollybush Drive & Main Street, bicycle lanes constructed
- Rymal Road - between Spadara Drive & Garth Street & Hazelton Avenue, a bicycle path constructed beside the sidewalk
- Brock Road - between Concession 4 W & Harvest Road, paved shoulders constructed
- Delaware Avenue/Maplewood Avenue - bicycle lanes painted
- Gage Avenue - between Industrial Drive & Lawrence Road, bicycle lanes painted
- Scenic Drive - West 35th Street & Colquhoun Crescent, bicycle lanes painted
- Sydenham Road - between Highway 5 & Romar Drive (the Brow), paved shoulders constructed
- Bay Street - between Stuart Street & Aberdeen Avenue, bike lanes/cycle track painted
- Chippawa Rail Trail Connection at Stone Church Road - a multi-use trail access constructed
- Garth Street - between Rymal Road & Twenty Road, bike lanes painted
- Longwood Road - between Franklin Avenue & King Street, southbound bike lane painted
- Upper Sherman Avenue - between Stone Church Road & Rymal Road, bike lanes constructed
- Wilson Street - between Hamilton Drive & Seminole Road, bike lanes constructed
- Garth Street - between Stone Church Road & Rymal Road, a bike path beside the sidewalk constructed
- Upper Sherman Avenue - between Limeridge Road & Stone Church Road, bike lanes constructed
- Regional Road 56 - between Cemetery Road & Southbrook Drive, bike lanes constructed
- Wentworth Street - between Delaware Avenue & the Escarpment Rail Trail, bike lanes painted
- Rice Avenue - between Sanatorium Road & Wendover Drive, bike lanes painted
- Wilson Street - between Seminole Road & Fiddler’s Green Road, a combination of bike lanes and sharrows painted
- Isaac Brock Drive - bike lanes painted
- Limeridge Road - between Birchview Drive & Upper Ottawa Street, sharrows painted
- Winterberry Drive - a southbound bike lane and northbound sharrows between Paramount Drive & Highland Road
- Highland Road - between Winterberry Drive & Upper Centennial Parkway, bike lanes painted
- Upper Red Hill Parkway - between Stone Church Road & Rymal Road, a multi-use trail opened
- Rymal Road - a multi-use trail connecting Pritchard Road & Trinity Church Road
- Charlton Avenue - between James Street & Dundurn Street, a westbound bike lane painted
- Herkimer Street - between Dundurn Street & MacNab Street, an eastbound bike lane painted
- Centre Rd - paved shoulders between Woodend Drive & Carlisle Road
- Cannon Street - between Gage Avenue & Kenilworth Avenue/Barons Avenue, bike lanes painted
- King Street - between Battlefield Drive & Elm Avenue, sharrows painted
- Mountain Brow Boulevard - between the Kimberly Stairs & Mohawk Road, multi-use trail constructed
- Queensdale Avenue - between Upper Wellington Street & Upper Sherman Avenue, sharrows painted
- West 5th Street - between Limeridge Road & Stone Church Road, painted
- Cannon Street - between Lottridge Street & Gage Avenue, painted
- York Boulevard - between Dundurn Street & Hess Street, painted
- Cannon Street cycle track - between Hess Street and Sherman Avenue, painted
- A multi-use trail along the south side of Aberdeen Avenue between Longwood Road and Glenside Avenue constructed
- Twenty Road - between Nebo Road & Glover Road, completed
- Bay Street - between Bayfront Park (Strachan Street) & Stuart Street, painted
- Hunter Street - two segments installed in June 2014: Queen Street to MacNab Street and Catharine Street to Liberty Street
- Main Street - a two-way bike path behind the existing sidewalk between the bridge over Hwy 403 & Frid Street
- Longwood Road - a two-way bike path behind the existing sidewalk between Frid Street & Aberdeen Avenue
- Sanatorium Road - between Scenic Drive & Rice Avenue
- Burlington Street - a multi-use trail along the south side of the street between Gage Avenue & Ottawa Street completed
- Binbrook Road - between Royal Winter Drive & Road #56, completed
- Young Street - between Ferguson Avenue & Wellington Street, painted
- West 5th Street - between Marlowe Drive & Limeridge Road (including reconstruction of existing bike lanes) completed
- King Street - between Westdale Village (Cline Avenue) & Macklin Street, plus westerly of Haddon Avenue painted
- Hwy 8 (Stoney Creek) - between Dewitt Road & Glover Road, completed
- Queensdale Avenue - between Upper Wellington Street & Upper Wentworth Street (pilot), painted
- King Street - between Paradise Road & Breadalbane Street, reconstruction & extension of the two-way cycling facility
- Main Street - between Macklin Street & Frid Street, now a two-way cycling facility over Hwy 403, painted
- Burke Street in Waterdown - south side of Dundas Street (former Hwy 5), painted
- Victoria Avenue - northbound only, between Ferrie Street & Barton Street, painted
- West 5th Street - between Mohawk College entrance (Governors Boulevard) & Mohawk Road, wider curb lanes with sharrows, painted
- Fall Fair Way and Bradley Avenue in Binbrook, painted
- Woodward Avenue - between Beach Boulevard & Brampton Street, painted
- Fifty Road - between McCollum Road (the lakeshore) & North Service Road, painted
- Burlington Street - westbound only, between Wellington Street & Ferguson Avenue, painted
- Dundurn Street - between York Boulevard & King Street, painted
- A multi-use trail over Hwy 403 south of Main Street between Leland Street & Studholme Road, opened. An extension of the Hamilton-Brantford Rail Trail.
- Wilson Street Hill - between Lower Lions Club Road & Rousseaux Street, resurfacing of the bike lanes where required
- Trinity Church Road - between Rymal Road & Pinehill Drive, painted
- Pinehill Drive - between Dakota Boulevard & Fletcher Road, painted
- Stinson Street - between Victoria Avenue & Wentworth Street, painted
- Dock Service Road - between Catharine Street & Ferguson Avenue, painted
- Jolley Cut - an up-bound bike lane from the start of the bridge to Concession Street
- Upper Wellington Street - between Stone Church Road & Rymal Road
- A multi-use trail over the QEW by the Red Hill Valley, opened
- Woodward Avenue - between Brampton Street & Melvin Avenue, painted
- Stone Church Road - between Garth Street & Upper James Street (the "missing link" in the full length of Stone Church Road) painted
- York Boulevard - between Queen Street & James Street, painted
- A multi-use trail over the LINC/RHVP near Albion Falls, completed
- Longwood Road - between King Street & Main Street, painted and existing Longwood Road bike lanes resurfaced north of Franklin Avenue to Princess Point
- Dundurn Street - between Main Street & Aberdeen Avenue, painted
- Paramount Drive and Winterberry Drive (north of Paramount Drive) in the Heritage Green neighbourhood
- King Street - between Nash Road & Battlefield Drive
- Sanders Boulevard - between West Park Avenue & Cootes Drive
- North Service Road - a well defined cycling route, comprised of a combination of on-street bike routes, on-street painted bike lanes, and off-road multi-use trails, between Confederation Park and Fifty Point Conservation Area
- York Boulevard - on-street bike lanes between Dundurn Street and the City of Burlington border
- Ferguson Avenue bike lanes, including on the new bridge north of Barton Street
- Stone Church Road - continued implementation of on-street bike lanes implemented in many sections, including between Upper James Street and Upper Wellington Street and east of Pritchard Road
- King Street - between Pottruff Road and Nash Road
- Bicycle-Friendly Stairs - constructed from Kimberly Drive up to Mountain Brow Boulevard
- Bike Racks in various BIAs
- Eastport Drive Lift Bridge - a bicycle-friendly stairway has been built on the Hamilton side of the bridge as well as a paved trail leading from the stairway to the Beach Trail
- Sterling Street - on-street bike lanes
- Longwood Road North - on-street bike and pedestrian lanes
- Upper Paradise Road - on-street bike lanes
Cycling infrastructure includes both bike lanes and multi-use trails.
Who Does What?
- Bike lanes within the paved portion of the roadway are maintained as part of the street network by Road Operations.
- Signage, pavement markings, and traffic signals are maintained by Traffic Operations & Engineering.
- Multi-use trails are part of the parks and open space system, and are maintained by Parks Maintenance.
Typically, the multi-use trails that are maintained by the City are owned by the City of Hamilton. There are other trails within the city that are owned and maintained by other organizations, such as the Hamilton Conservation Authority.
Winter maintenance - The City provides winter maintenance of bike lanes within the paved portion of the roadway. Select multi-use trails are ploughed in winter.
Rural resurfacing - In rural areas, the annual road resurfacing process makes cycling a challenge for one or two months afterwards.