Highbury Meadows Park
Madison Dalley
Landscape Architect
Call 905-546-2424 ext.1107
Email [email protected]
Highbury Meadows Park Development
Review the park development concepts and survey results from feedback provided between April 8 to May 17, 2024.
Highbury Meadows Park is a new 1.7 hectare (4.2 acre) neighbourhood park located directly north of Saltfleet High School at 110 Picardy Drive, Stoney Creek (ward 9). The park fronts on Picardy Drive to the east, residential properties to the north and west, and the high school to the south. Walkway blocks are also located in the west and northwest portions of the site, which will be connected to the park walkway system.
In April and May 2024, the City engaged with local residents to shape the vision of this space. A summary of engagement survey responses is available under the “Documents” tab of this web page.
The project scope will include:
- 3m wide asphalt walkways
- Sun shelter
- Multi-use court
- Junior and senior play structures with swings
- Drinking fountain
- Benches
- Naturalization area
- Tree plantings
- January-March 2024: Park concept plans and engagement strategy developed
- April-May 2024: Initial public engagement and survey
- July 2024-August 2025: Detailed design and construction documents
- January/February 2026: Project tendering
- April to August 2026: Construction (weather permitting)