The City of Hamilton completed a Municipal Class Environmental Assessment (MCEA) Addendum, an update to a previously completed study, for the York & Valley Road (HD016) Booster Pumping Station Capacity Upgrades. The project was undertaken to address the future water servicing needs of Waterdown and improve the capacity, reliability and operation of the existing booster pumping station. The Environmental Assessment confirmed that the preferred approach is to expand and upgrade the existing booster pumping station at 501 York Road, within the City's existing property.
Status: Complete. Preferred solution has been confirmed.
Project Need
The existing HD016 Booster Pumping Station was constructed in 1982 and provides water service to Waterdown and surrounding areas.
The project is needed to:
- Increase pumping capacity to meet future water demands.
- Improve reliability and redundancy within the water system.
- Replace aging equipment and infrastructure.
- Provide permanent standby power.
- Improve the facility to meet current operational, health and safety requirements.
- Support future water infrastructure improvements in the Waterdown area.
The project will increase the amount of water the station can reliably supply by more than half, allowing it to meet Waterdown's projected future water requirements.
Preferred Solution
The Environmental Assessment considered alternative approaches for addressing the future water servicing needs.
The preferred solution is to expand and upgrade the existing HD016 Booster Pumping Station at 501 York Road.
The project includes:
- Expansion of the existing pumping station building.
- Installation of additional pumping and valve equipment.
- Increased pumping capacity to meet future water demands.
- Redundant pumping systems to improve reliability.
- Permanent standby power.
- New and upgraded electrical and mechanical equipment.
- Improvements to site access and operations.
- Infrastructure to support future watermain connections.
Using the existing site avoids the need to acquire additional property and minimizes potential environmental and community impacts compared with alternative locations.
Learn More about the Project
The alternatives were evaluated based on technical requirements, cost, natural environment, land use, socio-economic considerations, cultural heritage and potential impacts to the surrounding community.
The preferred solution was identified as the option with the lowest overall environmental impact and lowest overall cost, while also providing the required water system capacity and reliability.
The preferred solution is located primarily within the existing City-owned pumping station property. Alternative locations considered through the Environmental Assessment would have required additional property and had greater potential impacts related to natural heritage and conservation lands.
The project is located adjacent to the Borer's Falls Off-Leash Park. The Environmental Assessment identified potential impacts associated with construction and site activities and recommended measures to reduce or manage these impacts.
Measures identified through the Environmental Assessment include:
- Protecting vegetation that is to remain on site.
- Managing erosion and sediment during construction.
- Managing construction-related noise and dust.
- Maintaining appropriate access and site safety.
- Completing required environmental and archaeological investigations.
- Restoring areas disturbed by construction.
- Following applicable requirements related to vegetation removal and breeding birds.
A portion of the small-dog area within the pumping station property will be affected by the project.
The HD016 Booster Pumping Station upgrades are part of broader improvements to the Waterdown water system.
The project is being coordinated with other planned infrastructure improvements, including the Waterdown Trunk Watermain Twinning project (a second large watermain that will provide a backup supply route), to support future growth and improve the capacity and reliability of the overall water system.
The original project was identified through the City's 2006 Water and Wastewater Master Plan Class Environmental Assessment.
Since more than 10 years had passed since the original Environmental Assessment and construction had not proceeded, the City completed an MCEA Addendum in 2022 to confirm that the original project remained appropriate based on current conditions, planning requirements and infrastructure needs.
Public consultation was completed as part of the Addendum process, including a Public Information Centre. The completed Addendum was available for public review for 30 days from September 22 to October 21, 2022.
The Environmental Assessment Addendum confirmed the preferred solution of expanding and upgrading the existing HD016 Booster Pumping Station.